Abstract
Background Vertical shafts are typically employed in the deep mining areas of Jurassic coalfields in western China. However, the direct exposure of extremely thick Cretaceous aquifers frequently leads to significant water inflow in shafts. Meanwhile, the continuous sand-carrying water inflow and scouring in vertical shafts pose serious safety hazards to the overall quality of shaft walls. Methods In underground water exploration and discharge boreholes, water outlets are below the floors of aquifers to be drained. This allows unpowered water discharge. In other words, water can flow out naturally. By fully leveraging this advantage, combined with the favorable condition of spatial trajectory control during surface directional drilling, this study investigated the deep vertical shafts in a production mine in the Binchang mining area of the Huanglong coal base within a Jurassic coalfield in western China. Accordingly, this study proposed a nondestructive technical approach to controlling water in extremely thick sandstones in deep vertical shafts based on advance drainage through directional drilling. Using the COMSOL Multiphysics finite element numerical simulation platform, this study conducted numerical processing of Darcy seepage overflow boundaries and permeable layer boundaries to address the challenge that the structures and natural drainage processes of directional boreholes cannot be scientifically described using the passive pumping model of surface vertical wells. Accordingly, this study established a numerical simulation model of the groundwater system integrating deep-seated, thick, water-rich sandstone aquifers, surface directional boreholes for advance drainage, and deep vertical shafts. Using this model, this study quantitatively explored the changes in water inrush and water reduction effects in vertical shafts under the condition of advance regional drainage via surface directional boreholes.Results and Conclusions The simulation results of water inrush in the shafts studied indicate that the water inflow in drainage boreholes ZX1‒ZX4 was 34 m3/h, 27 m3/h, 38 m3/h, and 42 m3/h, respectively, as determined by the numerical processing of the four drainage boreholes and the integral of groundwater flow velocity around borehole and shaft walls. Meanwhile, the water inflow of the main and auxiliary vertical shafts decreased from 21.5 m3/h and 22 m3/h to 5.82 m3/h and 4.43 m3/h, respectively. Therefore, water reduction in the vertical shafts studied can be achieved by advance drainage via four surface directional boreholes, with the water reduction effect satisfying the safety and quality requirements for shafts. The results of this study will provide a reference for the scientific management, analysis, and calculation against water hazards in shafts in deep mines within Jurassic coalfields in western China.
Keywords
extremely thick sandstone, water inrush in shaft, directional drilling, drainage model, dewatering and depressurization
DOI
10.12363/issn.1001-1986.24.11.0737
Recommended Citation
ZHAO Chunhu, ZHU Mingcheng, JI Yadong,
et al.
(2025)
"Construction and application of a model for drainage via directional boreholes against water hazards in deep vertical shafts,"
Coal Geology & Exploration: Vol. 53:
Iss.
5, Article 13.
DOI: 10.12363/issn.1001-1986.24.11.0737
Available at:
https://cge.researchcommons.org/journal/vol53/iss5/13
Reference
[1] 彭苏萍,毕银丽. 黄河流域煤矿区生态环境修复关键技术与战略思考[J]. 煤炭学报,2020,45(4):1211−1221.
PENG Suping,BI Yinli. Strategic consideration and core technology about environmental ecological restoration in coal mine areas in the Yellow River Basin of China[J]. Journal of China Coal Society,2020,45(4):1211−1221.
[2] 董书宁,樊敏,郭小铭,等. 陕西省煤矿典型水灾隐患特征及治理技术[J]. 煤炭学报,2024,49(2):902−916.
DONG Shuning,FAN Min,GUO Xiaoming,et al. Characteristics and prevention and control techniques of typical water hazards in coal mines in Shaanxi Province[J]. Journal of China Coal Society,2024,49(2):902−916.
[3] 李超峰,虎维岳,刘英锋. 洛河组含水层垂向差异性研究及保水采煤意义[J]. 煤炭学报,2019,44(3):848−857.
LI Chaofeng,HU Weiyue,LIU Yingfeng. Vertical hydrogeological characteristics of Luohe aquifer and its significance of water–preserved coal mining[J]. Journal of China Coal Society,2019,44(3):848−857.
[4] 赵春虎,王世东,靳德武,等. 陕北与神东煤炭基地煤矿开采对地下水资源影响研究现状与评价方法[J]. 绿色矿山,2024,2(2):150−159.
ZHAO Chunhu,WANG Shidong,JIN Dewu,et al. Research status and evaluation methods on the impact of coal mining on groundwater resources in Shaanbei and Shendong coal bases[J]. Journal of Green Mine,2024,2(2):150−159.
[5] 孙辉. 核桃峪煤矿主斜井施工防治水技术研究[D]. 西安:西安科技大学,2018.
SUN Hui. Study on water prevention and control of main inclined shaft in Hetaoyu Coal Mine[D]. Xi’an:Xi’an University of Science and Technology,2018.
[6] 柴敬,袁强,王帅,等. 白垩系含水地层立井突水淹井治理技术[J]. 煤炭学报,2016,41(2):338−344.
CHAI Jing,YUAN Qiang,WANG Shuai,et al. Water inrush control and restoration of shaft construction in Cretaceous aquifer[J]. Journal of China Coal Society,2016,41(2):338−344.
[7] 梁顺文. 五举煤矿白垩系立井施工涌水量预测及防治研究[D]. 西安:西安科技大学,2019.
LIANG Shunwen. Prediction and prevention of water inflow during construction of Cretaceous shaft in Wuju Coal Mine[D]. Xi’an:Xi’an University of Science and Technology,2019.
[8] 中华人民共和国住房和城乡建设部,国家市场监督管理总局. 煤矿井巷工程质量验收规范:GB 50213—2010[S]. 北京:中国标准出版社,2010.
[9] 贾继平,贺龙,梁哲. 注浆堵水技术在黄陵二号煤矿三号回风立井施工中的应用[J]. 能源技术与管理,2023,48(4):141−143.
[10] 方刚,梁向阳,黄浩,等. 巴拉素井田煤层富水机理与注浆堵水技术[J]. 煤炭学报,2019,44(8):2470−2483.
FANG Gang,LIANG Xiangyang,HUANG Hao,et al. Water–rich mechanism of coal seam and grouting and blocking water technology in Balasu mine field[J]. Journal of China Coal Society,2019,44(8):2470−2483.
[11] 张旺余,韩定锋,余智秘,等. 环形巷道在生产矿井冻结孔水害治理中的应用[J]. 陕西煤炭,2023,42(5):162−165.
ZHANG Wangyu,HAN Dingfeng,YU Zhimin,et al. Application of circular roadway in water damage control of frozen holes in production mines[J]. Shaanxi Coal,2023,42(5):162−165.
[12] 陈卫忠,王鲁瑀,谭贤君,等. 裂隙岩体地下工程稳定性研究发展趋势[J]. 岩石力学与工程学报,2021,40(10):1945−1961.
CHEN Weizhong,WANG Luyu,TAN Xianjun,et al. State–of–the–art and development tendency of the underground engineering stability of fractured rock mass[J]. Chinese Journal of Rock Mechanics and Engineering,2021,40(10):1945−1961.
[13] 张培森,许大强,李腾辉,等. 裂隙砂岩注浆前后渗流特性及注浆后力学特性试验研究[J]. 岩土力学,2023,44(增刊1):12−26.
ZHANG Peisen,XU Daqiang,LI Tenghui,et al. Experimental study of seepage characteristics before and after grouting and mechanical characteristics after grouting of fractured sandstone[J]. Rock and Soil Mechanics,2023,44(Sup.1):12−26.
[14] 赵春虎,王世东,姬中奎,等. 蒙陕矿区深部煤层开采顶板含水层失水特征与钻孔注水帷幕保护分析[J]. 煤田地质与勘探,2023,51(5):88−98.
ZHAO Chunhu,WANG Shidong,JI Zhongkui,et al. Analysis on water loss characteristics of roof aquifer and borehole hydraulic curtain protection in deep coal mining in Inner Mongolia–Shaanxi mining area[J]. Coal Geology & Exploration,2023,51(5):88−98.
[15] 时焱红,陈秀艳. 井下探放水钻孔涌水量优化预测及水量衰减规律研究[J]. 地理科学研究,2015,4:27−32.
SHI Yanhong,CHEN Xiuyan. The optimization of drilling water inflow prediction about the underground drain and the study on the attenuation law of water[J]. Geographical Science Research,2015,4:27−32.
[16] 靳月灿,孙亚军,徐智敏,等. 收缩开采期封闭不良钻孔的涌水量预测研究[J]. 中国煤炭,2012,38(6):99−103.
JIN Yuecan,SUN Yajun,XU Zhimin,et al. Research on water inflow prediction from bad sealed boreholes in contraction coal mining[J]. China Coal,2012,38(6):99−103.
[17] 陈实,董书宁,李竞生,等. 煤矿工作面顶板倾斜钻孔疏放水井流计算方法[J]. 煤炭学报,2016,41(6):1517−1523.
CHEN Shi,DONG Shuning,LI Jingsheng,et al. Analytical solution for slanted well in the roof of coal mine working face[J]. Journal of China Coal Society,2016,41(6):1517−1523.
[18] 李明山. 伯努利方程与井下探放水钻孔涌水量计算[J]. 矿业安全与环保,1999,26(2):37−38.
[19] 王玮. 渗流井取水计算模型及其应用[M]. 西安:陕西科学技术出版社,2010.
[20] 刘基,靳德武,王皓. 基于含水层–钻孔水量交换的疏水钻孔水量计算[J]. 煤炭学报,2021,46(9):2995−3005.
LIU Ji,JIN Dewu,WANG Hao. Water yield calculation of drainage boreholes based on water exchange between aquifers and boreholes[J]. Journal of China Coal Society,2021,46(9):2995−3005.
[21] 赵春虎,尚宏波,靳德武,等. 深层垂直井同轴换热能力数值模拟分析[J]. 煤田地质与勘探,2020,48(5):174−181.
ZHAO Chunhu,SHANG Hongbo,JIN Dewu,et al. Numerical simulation of coaxial heat transfer capacity of deep vertical wells[J]. Coal Geology & Exploration,2020,48(5):174−181.
[22] 赵春虎,王世东. 煤矿井下疏水钻孔涌水时空效应与顶板水害控制疏水模式[J]. 采矿与安全工程学报,2023,40(2):313−321.
ZHAO Chunhu,WANG Shidong. Time and space effect of water gushing from drainage borehole in coal mine and controlling drainage to prevent roof water disaster in coal seam[J]. Journal of Mining & Safety Engineering,2023,40(2):313−321.
[23] 齐跃明,吴佳欣,王旭升,等. 变径抽水井降深和涌水量关系的混合井模型[J]. 地质科技通报,2023,42(4):65−74.
QI Yueming,WU Jiaxin,WANG Xusheng,et al. Mixed-well model of the relation between drawdown and water inflow in a pumping well with variable-diameter[J]. Bulletin of Geological Science and Technology,2023,42(4):65−74.
[24] 李超峰. 采煤工作面顶板巨厚层状含水层涌水量预测研究[D]. 北京:煤炭科学研究总院,2019.
LI Chaofeng. Prediction theory and method of water inflow from roof thick layered aquifer of coal mining face[D]. Beijing:China Coal Research Institute,2019.
[25] 李金龙,张允强,徐新启,等. 高家堡煤矿煤层顶板注浆加固堵水技术探讨[J]. 煤田地质与勘探,2019,47(增刊1):20−25.
LI Jinlong,ZHANG Yunqiang,XU Xinqi,et al. Reinforcement and water plugging technology of roof grouting in Gaojiabao Coal Mine[J]. Coal Geology & Exploration,2019,47(Sup.1):20−25.
[26] 王雪松,程桦,荣传新,等. 基于地面定向钻孔注浆的煤矿立井钻井法井壁渗漏水治理技术[J]. 煤炭科学技术,2024,52(7):168−177.
WANG Xuesong,CHENG Hua,RONG Chuanxin,et al. Well wall water leakage control technology of vertical well drilling method in coal mines based on grouting of ground directional drilling[J]. Coal Science and Technology,2024,52(7):168−177.
[27] 赵春虎,董书宁,王皓,等. 采煤工作面顶板含水层井下疏水钻孔涌水规律数值分析[J]. 煤炭学报,2020,45(增刊1):405−414.
ZHAO Chunhu,DONG Shuning,WANG Hao,et al. Analysis of water inrush from boreholes for drainage of confined aquifer by upward boreholes in underground coal mining face[J]. Journal of China Coal Society,2020,45(Sup.1):405−414.
Included in
Earth Sciences Commons, Mining Engineering Commons, Oil, Gas, and Energy Commons, Sustainability Commons