Coal Geology & Exploration

Abstract

Yuanbaoshan open-pit coal mine of Inner Mongolia is a rare extra large water rich open-pit coal mine at home and abroad. In order to resolve the problems of high production cost and high environmental risk caused by drainage for many years, it is plan to adopt water cutoff curtain technology to closure the seepage supply channel. By analyzing the hydrogeological and engineering geological conditions of the mine, the groundwater water control method of combining arc semi-closed curtain with group wells drainage hydraulic curtain was proposed. The curtain test study was carried out in the mine 452 m flat plate by using the vertical concealed overlay laying of geomembranes and the filling process of impermeable concrete. A water cutoff curtain with a plane length of 1 369 m, an average depth of 29 m, an effective thickness > 0.8 m and bottom embedded in bedrock surface of 3 m was built, During the test study, the technology of water cutoff curtain was determined in Yuanbaoshan open-pit mine. The main technical parameters such as the excavation length of single trench section (14 m), the retaining wall mud density (1.05-1.25 g/cm3) and the overlapping width of the geomembrane (1 m) were obtained, and the technology of underwater magnetic suction connection of geomembranes was put forward, by adding magnetic strips, the underwater self-adhesion of the geomembrane overlaps on the principle of Yin-Yang magnetic suction was accomplished. After the experiment project, the quality and water interception effect of curtain wall were tested by drilling verification, flow field analysis and runoff changes. The results show that the concrete pouring and filling is continuous and the water level difference between inside and outside of the wall has reached more than 15 m; the recharge flow of blind-ditch disappears, and the water interception effect is remarkable. The experimental research proves that the water interception curtain technology is suitable for Yuanbaoshan open-pit coal mine, and provides key technical parameters for the follow-up project, improves the water interception curtain technology system of open-pit coal mine of China.

Keywords

Yuanbaoshan open-pit coal mine, water cutoff curtain, effect test, technical parameter, geomembrane connection, experimental research

DOI

10.12363/issn.1001-1986.21.12.0768

Reference

[1] 李浩荡,佘长超,周永利,等. 我国露天煤矿开采技术综述及展望[J]. 煤炭科学技术,2019,47(10):24−35. LI Haodang,SHE Changchao,ZHOU Yongli,et al. Summary and prospect of open−pit coal mining technology in China[J]. Coal Science and Technology,2019,47(10):24−35.

[2] 林淋,刘英璐. 露天煤矿绿色开采扰动效应[J]. 露天采矿技术,2017,32(8):57−60. LIN Lin,LIU Yinglu. Disturbance effect of green mining in open–pit coal mine[J]. Opencast Mining Technology,2017,32(8):57−60.

[3] 田会,王忠鑫. 露天开采对环境的扰动行为及其控制技术[J]. 煤炭学报,2018,43(9):2416−2421. TIAN Hui,WANG Zhongxin. Disturbance behavior of open–pit mine on enviroment and its control technology[J]. Journal of China Coal Society,2018,43(9):2416−2421.

[4] 赵春虎,王强民,王皓,等. 东部草原区露天煤矿开采对地下水系统影响与帷幕保护分析[J]. 煤炭学报,2019,44(12):3685−3692. ZHAO Chunhu,WANG Qiangmin,WANG Hao,et al. Analysis of influence of open–pit coal mining on groundwater system and curtain wall protection in grassland area of northeastern China[J]. Journal of China Coal Society,2019,44(12):3685−3692.

[5] 宋子岭,赵东洋,张宇航,等. 露天煤矿绿色开采生态环境评价体系模糊评判研究[J]. 煤炭科学技术,2019,47(10):58−66. SONG Ziling,ZHAO Dongyang,ZHANG Yuhang,et al. Study on evaluation model and application of green mining ecological envrioment evaluation system in open–pit coal mine[J]. Coal Science and Technology,2019,47(10):58−66.

[6] 张雁,黄选明,靳德武. 基于截水帷幕的露天煤矿绿色开采实践[J]. 露天采矿技术,2021,36(2):85−89. ZHANG Yan,HUANG Xuanming,JIN Dewu. Practice of green mining in open–pit coal mine based on water cutoff curtain[J]. Opencast Mining Technology,2021,36(2):85−89.

[7] 张雁,黄选明,彭巍,等. 截水帷幕在露天煤矿截渗减排中的应用[J]. 煤炭学报,2020,45(5):1865−1873. ZHANG Yan,HUANG Xuanming,PENG Wei,et al. Appliction of water cutoff curtain in the seepage cutoff and drainage reduction of open−pit coal mine[J]. Journal of China Coal Society,2020,45(5):1865−1873.

[8] 赵毅. 国外露天矿帷幕堵水及在我国的应用前景[J]. 露天采矿技术,1987(3):24−30. ZHAO Yi. Water blocking curtain in open–pit mines abroad and application prospect in China[J]. Opencast Mining Technology,1987(3):24−30.

[9] 张雁. 露天煤矿防渗墙截渗减排机制及工程应用研究[D]. 北京:煤炭科学研究总院,2018.

ZHANG Yan. Study on the mechanism and engineering application of seepage cutoff and drainage reduction of diaphragm wall in open–pit coal mine[D]. Beijing:China Coal Research Institute,2018.

[10] 党亚杰,肖昭然,聂彬. 地下连续墙入岩成槽施工工艺改进[J]. 施工技术,2015,44(1):43−45. DANG Yajie,XIAO Zhaoran,NIE Bin. Improvement of injection constrution technique of diaphragm wall[J]. Construction Technology,2015,44(1):43−45.

[11] 王敏. 超深基坑工程地下连续墙支护施工技术[J]. 铁道建筑,2014(7):86−88. WANG Min. Construction technology of diaphragm wall support in ultra deep foundation pit engineering[J]. Railway Engineering,2014(7):86−88.

[12] 赵纪栋. 杭州砂性土层中地下连续墙的质量控制[J]. 施工技术,2013,42(增刊2):52−55. ZHAO Jidong. Quality control of diaphragm wall in sandy layer of Hangzhou[J]. Construction Technology,2013,42(Sup.2):52−55.

[13] 曹海东,苗贺朝,迟赞,等. 基于低强度抗渗混凝土的露天煤矿帷幕截水技术[J]. 煤田地质与勘探,2020,48(4):61−67. CAO Haidong,MIAO Hechao,CHI Zan,et al. Water cutoff curtain technology of open–pit coal mine based on low strength impermeable concrete[J]. Coal Geology & Exploration,2020,48(4):61−67.

[14] 张雁. 露天煤矿截渗减排新技术[J]. 露天采矿技术,2017,32(6):45−47. ZHANG Yan. New technology of cutting off seepage channel and reducing water drainage in open–pit coal mine[J]. Opencast Mining Technology,2017,32(6):45−47.

[15] 张雁,靳德武,石磊. 基于数值模拟的截水帷幕渗透系数研究[J]. 煤炭技术,2021,40(2):99−102. ZHANG Yan,JIN Dewu,SHI Lei. Study on permeability coefficient of cutoff curtain based on numerical simulation[J]. Coal Technology,2021,40(2):99−102.

[16] 王海,彭巍,曹海东,等. 露天煤矿截水帷幕效果检验方法及截水效果分析[J]. 煤田地质与勘探,2020,48(4):87−93. WANG Hai,PENG Wei,CAO Haidong,et al. Inspection method and analysis of the effect of water cutoff curtain in open–pit coal mine[J]. Coal Geology & Exploration,2020,48(4):87−93.

[17] 董书宁,王海,黄选明,等. 基于保障生态地下水位的露天煤矿主动保水技术研究[J]. 煤炭科学技术,2021,49(4):49−57. DONG Shuning,WANG Hai,HUANG Xuanming,et al. Research on active water conservation technology in open–pit coal mine based on ecological protection groundwater level[J]. Coal Science and Technology,2021,49(4):49−57.

[18] 张雁. 露天煤矿防渗墙构建条件与类型[J]. 煤炭技术,2019,38(7):25−28. ZHANG Yan. Construction conditions and types of diaphragm wall in open−pit coal mine[J]. Coal Technology,2019,38(7):25−28.

[19] 何旭升,何玉华. 圆砾地层地下连续墙成槽工法与施工接头技术[J]. 地下空间与工程学报,2013,9(增刊1):1701−1704. HE Xusheng,HE Yuhua. Trenching technology and construction joint technology of the diaphragm wall in the round gravel stratum[J]. Chinese Journal of Underground Space and Engineering,2013,9(Sup.1):1701−1704.

[20] 能昌信,孙新宇,徐亚,等. 垂直HDPE膜安装过程的电学破损检测方法[J]. 环境工程学报,2018,12(1):349−355. NAI Changxin,SUN Xinyu,XU Ya,et al. Electrical method to locate damage in vertical HDPE geomembrane during installation[J]. Chinese Journal of Environmental Engineering,2018,12(1):349−355.

[21] 蒋众喜,刘宁. 工业尾矿填埋场边坡上防渗膜稳定性分析[J]. 中南大学学报(自然科学版),2018,49(3):672−677. JIANG Zhongxi,LIU Ning. Stability analysis of geomembrane in industrial tailings landfill slope[J]. Journal of Central South University (Science and Technology),2018,49(3):672−677.

[22] 束一鸣,吴海民,姜晓桢. 中国水库大坝土工膜防渗技术进展[J]. 岩土工程学报,2016,38(增刊1):1−9. SHU Yiming,WU Haimin,JIANG Xiaozhen. The development of anti–seepage technology with geomembrane on reservoirs and dams in China[J]. Chinese Journal of Geotechnical Engineering,2016,38(Sup.1):1−9.

[23] 李文嵩,党亚堃,朱明诚,等. 露天煤矿截水帷幕防渗膜垂向隐蔽铺设施工工艺[J]. 煤田地质与勘探,2020,48(4):68−73. LI Wensong,DANG Yakun,ZHU Mingcheng,et al. Construction technology of vertical concealed laying of anti−seepage membrane for water cutoff curtain in the open–pit coal mine[J]. Coal Geology & Exploration,2020,48(4):68−73.

[24] 周小娟,谢文刚,杨禹. HDPE膜柔性垂直防渗墙的施工细节优化设计[J]. 环境卫生工程,2020,28(1):83−85. ZHOU Xiaojuan,XIE Wengang,YANG Yu. Optimization design on construction details of HDPE membrane flexible vertical anti–seepage wall[J]. Environmental Sanitation Engineering,2020,28(1):83−85.

[25] 蔡小华,李歌华. 建筑基桩质量钻芯法检测几个问题的探讨[J]. 工程勘察,2005(4):31−35. CAI Xiaohua,LI Gehua. Discussion on several problems of core drilling detection of building foundation pile quality[J]. Geotechnical Investigation & Surveying,2005(4):31−35.

[26] 牟勇忠,周传波,肖文芳,等. 富水断层非标准三角堰测法流量计算方法及工程应用[J]. 地质科技通报,2020,39(6):185−192. MOU Yongzhong,ZHOU Chuanbo,XIAO Wenfang,et al. Flow calculation method and engineering application of non–standard triangle weir measurement method for rich–water faults[J]. Bulletin of Geological Science and Technology,2020,39(6):185−192.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.